Structures planned by element, inside the road or on their own.
Foundations, substructure, superstructure and finishes as elements, with inspections, materials and commercial control from Tier 3.
Supported today
Only what the product does now. Further project types are added as they are built and tested.
- Element-based planning
- Inspections and RFIs with photo evidence
- Materials and test records
- IPCs and variations
- Handover records (rolling out)
SectionCh 2+300 to 2+600
ActivitySubbase, layer 2
Quantity placed1,240 m³
0.3476, 32.5825 · 10:42 (sample)
DiaryDry, 27 °C. 14 labour, grader and roller.
Submitted for review
Recorded once, at the time
- Engineer records progress for the section
- Attaches a photo; time and location are stored with it
- Writes the diary entry
- Submits; the department head reviews
Location and time support a record; they do not prove it on their own. Review by the right person does.
Demonstration dataStart with one project.
Set up a home, a building or a road in minutes. Bring your team in by link when you are ready.