Drawings, letters and approvals where the team can find them.
A document vault, transmittals, letters in and out, shop drawings and approvals, with access limited to the people who should see each file.
The problem
Drawings are emailed in revisions nobody can track, letters are filed in personal inboxes, and on a road job no one can find the document for a given chainage.
One place for the record, controlled by role.
What you can do
Vault
Project documents with type, revision and review dates.
Letters and transmittals
Numbered letters in and out, with references that never repeat.
Shop drawings and approvals
Submitted, reviewed and approved with comments.
Find by chainage
Documents found within ±50 m of a chainage on road projects.
Access by role
Each person sees what their role needs; private storage on every bucket.
Civil 360 Assistant
Ask about your documents and get answers with the source cited.
The workflow
- Upload the document
- Classify it
- Send for review
- Approve with comments
- Find it later in seconds
Available on
Compare tiersRelated
Start with one project.
Set up a home, a building or a road in minutes. Bring your team in by link when you are ready.