See what every machine did today and what it cost the project.

An equipment register for owned, leased and rented plant, with daily logs of operating hours, idle time, fuel, operators and downtime, and cost allocated to the work it did.

Rolling outT1T2T3

Daily plant and fuel logs are live on Tier 3 projects. The equipment register with reproducible costing is rolling out now.

Plant today · Lot 2

Demonstration data
Equipment hours today
MachineHours (operating · idle · down)UseCost to BOQ
EX-03Excavator 30 t · Ch 2+30073%UGX 1.85m
GR-01Motor grader · Ch 1+80065%UGX 1.42m
RL-02Vibratory roller · Ch 1+80054%UGX 0.96m
TP-07Tipper 20 m³ · Haul88%UGX 0.88m
TP-08Tipper 20 m³ · Haul42%UGX 0.88m
OperatingIdleDownUse = operating ÷ (operating + idle + down). Cost from approved logs, allocated to the BOQ activity worked.

The problem

Plant is often the largest cost on a road job and the least measured. Idle hire charges, fuel and breakdowns are noticed at month end, if at all.

What changes

Idle hire and fuel loss become visible the day they happen.

What you can do

Equipment register

Owned, leased and rented plant with rates and documents.

Daily plant and fuel logs

Operating hours, idle hours, fuel issued and operator.

Downtime and maintenance

Breakdowns, service intervals and repair history.

Utilisation and productivity

Operating against available hours, output against activity.

Cost allocation

Approved logs produce reproducible plant cost against BOQ activities.

Project assignment

Which machine is on which project and section.

The workflow

  1. Register the machine
  2. Assign it to a project
  3. Log hours and fuel daily
  4. Approve the log
  5. Cost flows to the activity

Start with one project.

Set up a home, a building or a road in minutes. Bring your team in by link when you are ready.