See what every machine did today and what it cost the project.
An equipment register for owned, leased and rented plant, with daily logs of operating hours, idle time, fuel, operators and downtime, and cost allocated to the work it did.
Daily plant and fuel logs are live on Tier 3 projects. The equipment register with reproducible costing is rolling out now.
Plant today · Lot 2
Demonstration data| Machine | Hours (operating · idle · down) | Use | Cost to BOQ |
|---|---|---|---|
| EX-03Excavator 30 t · Ch 2+300 | 73% | UGX 1.85m | |
| GR-01Motor grader · Ch 1+800 | 65% | UGX 1.42m | |
| RL-02Vibratory roller · Ch 1+800 | 54% | UGX 0.96m | |
| TP-07Tipper 20 m³ · Haul | 88% | UGX 0.88m | |
| TP-08Tipper 20 m³ · Haul | 42% | UGX 0.88m |
The problem
Plant is often the largest cost on a road job and the least measured. Idle hire charges, fuel and breakdowns are noticed at month end, if at all.
Idle hire and fuel loss become visible the day they happen.
What you can do
Equipment register
Owned, leased and rented plant with rates and documents.
Daily plant and fuel logs
Operating hours, idle hours, fuel issued and operator.
Downtime and maintenance
Breakdowns, service intervals and repair history.
Utilisation and productivity
Operating against available hours, output against activity.
Cost allocation
Approved logs produce reproducible plant cost against BOQ activities.
Project assignment
Which machine is on which project and section.
The workflow
- Register the machine
- Assign it to a project
- Log hours and fuel daily
- Approve the log
- Cost flows to the activity
Available on