Hand over a record of the asset, not a box of files.
Commissioning records, O&M manuals, warranties, defects and the defects-liability period carried into an asset register with maintenance schedules and repair history.
Handover is a programme stage today. The project asset register, warranties, DLP and maintenance are rolling out now.
Section 1, Ch 0+000 to 2+000
Demonstration data- As-built drawings18 sheets
- O&M manualDrainage and lighting
- Commissioning recordsStreet lighting tests
- WarrantyRoad markings, to Oct 2028
- Defects2 open of 16
- Maintenance planDrain clearing, quarterly
- Defects-liability period
- to 18 Oct 2028
- Next maintenance
- Drain clearing, Jan
A digital handover package supports acceptance. It does not replace the taking-over certificate under the contract.
The problem
At completion, the knowledge of how a building, road or bridge was built is scattered and quickly lost. Owners then maintain assets without drawings, warranties or a record of defects.
The owner inherits a usable record of what was built.
What you can do
Snags and defects
Defect register with photos, responsibility and close-out.
Commissioning and handover
Test certificates and handover documents in one package.
Warranties and DLP
Expiry dates and defects-liability periods tracked.
Asset register
Components with location, condition and linked documents.
Maintenance
Planned maintenance schedules and repair history.
Acceptance stays formal
A digital package supports acceptance; it does not replace the contractual certificate.
The workflow
- Close snags
- Collect commissioning records
- Assemble the handover package
- Accept into the asset register
- Maintain
Available on
Compare tiersRelated
Start with one project.
Set up a home, a building or a road in minutes. Bring your team in by link when you are ready.